| No. | YEAR | LOCATION | KIND OF WORK | PROJECT NAME OWNER | CONTRACT NO. |
| 1 | 2016 | Babelan Bekasi | Insulation For | PT. TRUBA JAYA ENGINEERING | NO.T3128-H-SCO-N-002 |
| 2 x 135 MW |
| CFB Boiler |
| 2 | 2016 | Dumai, riau | Replacement Insulation 140-V-1D In Order Inspection | PT. PERTAMINA RU II DUMAI | NO. 4907-A/SP/DMI/2015-S2 |
| 3 | 2016 | Jambi, Sumatera | Boiler CFB DSSP Jambi Refractory Dismantling and Reinstall Project | PT. INDOPORLEN | NO. 2164523167 |
| |
| 4 | 2017 | Sulawesi Selatan | Material Supply | PT. NUSA ENERGY GEMILANG | NO. 170902 |
| 5 | 2017 | Sulawesi Selatan | Material Supply | PT. NUSA ENERGY GEMILANG | NO. 171152 |
| 6 | 2017 | Jambi, Sumatera | Refractory Work Installation Project LPPPI – JAMBI MILL PWP | PT. SEPCO II INDO | YNZB-017 |
| 7 | 2018 | Bontang, Kaltim | Material Supply | PT. BADAK LNG | NO. CSPBD – 17029 |
| 8 | 2018 | Merak, Cilegon | Pipe Shoe Installation | PT WIKA-PEN | NO. 015/BBB-TS/I/2018 |
| 9 | 2018 | Merak, Cilegon | Cold Insulation for Pump Equipment | PT WIKA – PEN | NO. 089/BBB-TS/VII/2018 |
| 10 | 2018 | Merak, Cilegon | Pipe & Wripping Insulation, Supply | PT WIKA – PEN | NO. 018/BBB-TS/I/2018 |
| 11 | 2019 | Jepara,Jawa Tengah | Installation of Boiler, Piping, Duct, Aux & Refractory Works for Unit 5, 2X1000 MW | PT JURONG ENGINEERING LESTARI | NO. L30038S04 |
| 12 | 2019 | Pangalengan, Bandung | Pipe Thermal Insulation Services Blanket | STAR ENERGY GEOTHERMAL LTD. | NO. 3200000659 |
| 13 | 2020 | Bojonegoro, Jawa Timur | Insulation for Dress Up | PT Rekayasa Industri | JTB-RJJ000-KL-XCT-900-00139 |
| 14 | 2021 | Cilamaya, Jawa Barat | Insulalation Work | PT Meindo Elang Indah | 21239-PO-JAWA1-MEP-000188R1 |
| 15 | 2021/2022 | Bojonegoro, Jawa Timur | Painting Work | PT Rekayasa Industri | JTB-RJJ000-KL-XCT-900-00185 |
| 16 | 2021/2022 | Bojonegoro, Jawa Timur | Refractory Work | PT Rekayasa Industri | JTB-RJJ000-KL-XCT-900-00209 |